INSTRUCTIONS
Follow these step-by-step directions when using FRP Premium Adhesive:
Read directions and test small area before use.
- Unpack, position, and assemble column components following manufacturer’s directions.
- Surface should be clean, dry and free of dirt. Wipe down column surfaces/edges to be bonded with acetone or citrus based solvents to ensure complete removal of release agent/dust.
- Trim end of nozzle. Puncture inner seal.
- Product can be applied between 50 and 90 °F /10 and 32 °C.
- Apply a continuous bead of adhesive to each surface to be joined, wait approximately 2 minutes before mating the surfaces, then clamp column halves together following manufacturer’s directions.
- Excessive adhesive may be scraped or troweled away prior to curing. Sand seam with a vacuum-assisted (dustless) sander, 150 grit paper and appropriate personal protective equipment.
- For maximum-strength bond, allow 24-72 hours cure time.
- Prime and paint column following manufacturer’s instructions.
- Clean uncured adhesive with acetone or citrus-based solvents. Cured material may be removed by cutting or scraping. For prolonged cartridge storage after opening, cover or plug the opening of the nozzle.